Last up-date 02/06/2012

Cape Coral Bridge Toll Plaza Reconstruction No “Oversized Load” Trucks Permitted
Effective Immediately
Road Completion Street Evaluation, Countywide Resurfacing 2010-2011
How do I get my road paved? For information contact Cindy Pledger at...
CPledger@leegov.com
3-FY/ 2011 Countywide Resurfacing Roadway Improvement, Countywide Arterials & Collectors
2011 Service Volumes
Generalized Peak Hour Directional Service Volumes Urbanized Areas
What is COMPLETE STREETS?
Six Mile Cypress Access Resolution
Lee County DOT Plan Specifications 1/12/2011
Matlacha Bridge Replacement.
Hickory Blvd. Shoulder Project

DOT's Construction & Right-of-Way Plans. Search Page.....
View and Print plans.

1-FY/2011 Countywide Resurfacing Roadway Improvements-Lehigh Acres

2-FY2011 Countywide
Resurfacing Roadway
Improvements
Project Memorandum -
D.O.T. Public Workshops
Sidewalk Project Summary
Ben Pratt-Six Mile Cypress
Exhibits and Plans
All Current Roadway Project
CIP Project Summary
April 21, 2009

Projects Progress Pictures

Download Project Plans

DOT Resources:
Go
Access Resolutions:   
Go
Departments:
Go
Contractor's Online Forms:
Go
 

County Switchboard:(239) 533-2111

E Mail: webmaster@leegov.com
©2004 Lee County Official Website
 

 

Download Project Plans: Last up-date 02/06/2012
These are files that can be viewed and printed using the free Adobe Acrobat Reader
 12th Street West Sidewalk from Gunnery Rd. to Sunshine Blvd.
 A&W Bulb Rd Improvements  Gladiolus Dr. to Heritage Cove Blvd.  (Preliminary)
 Alico Road Connector Alignment Study Alico Rd. to SR 82: 
 Complete Appendix - Final Report from McMahon 07/01/09
 Ben C. Pratt Six Mile Cypress Pkwy. (Stimulus Plans-Nov2009) Four Laning
 "Preliminary Plans"

 Boca Grande As-Built Drainage System Improvement Plans.

 Bonita Beach Road  90% R/W MAPS, EAST OF OLD US 41 TO IMPERIAL ST.
 Bonita Beach Road. from Old US 41 to Lime St. Proj. #4044  100% Submittal
 Bonita Beach Road Phase III US 41 to Old US 41 60% Submitted
 Bonita Grande Drive at Bonita Beach Road Intersection
 Burnt Store Road Right-of-Way 30% Submittal
 Burnt Store Road Widening 60% Submittal
 Cape Coral Pkwy. and Del Prado Blvd. Intersection Improvements
 Cape Coral Toll Plaza Reconstruction Plans 60%
 Colonial Blvd. (CR 846) Six Laning  I-75 to SR. 82   (Bid Set, Revisions 1 and 2)
 Colonial Blvd. / Metro Pkwy. Queue Jump
 Corkscrew Road East of Ben Hill Griffin Parkway (Bid Plans)
 Daniel Pkwy. Six Laning from Chamberlin Pkwy. to Gateway Blvd. Final Submittal
 Daniels Pkwy. at Treeline Ave. Dual Eastbound to Northbound Turn
 Lanes
-
Signed and Sealed - 100% Submittal
 Del Prado Blvd - Median Safety Improvement - SE 44th St. to SE 41st St. 100%
 Submittal,      Exhibits: Presentation Median & Aerial of Del Prado Roads Project
 Estero Parkway Phase I Road Improvements
 Glenwood Avenue Sidewalk - 100% Submittal
 Gunnery Road - Lee Blvd. to North of SR. 82, 100% Submittal
 Hancock Bridge Parkway Extension/ Pondella Road Widening Study -
 Draft Final Project Summary Report
 Homestead Road  Alabama Blvd. to South of Sunrise Blvd. - Phase IV 100%
 Homestead Road  Alabama Blvd. to South of Sunrise Blvd. - Right of Way Plans
 Imperial Street - Bonita Beach to East Terry Street.
 Littleton Road Sidewalk
 Midpoint Toll Plaza Reconstruction Plans 60%
 Oriole Road Extension
 Ortiz Ave. Right-of-Way Map From S.R. 82 to S.R. 80
 Plantation Road Extension - 100% Submittal
 S.R. 82 and Daniels Pkwy.  100% Submittal
 Six Mile Cypress Pathways 
 Slater Road Sidewalk Improvements - Bayshore Rd.(SR78) to Mellow Ln.  
 Sunniland Blvd. Sidewalk Lee Blvd. to Park Rd.
 Three Oaks Parkway / Indian Pony Drive 60% plans 
 Williams Road. Sidewalk 100% Submittal ( 24" x 36" )
Bi-County Study-Burnt Store Rd, Veterans Pkwy. & Colonial Blvd.
  Corridor Study
  Phase I Final Report
  Phase II Concept  Report
  Phase II Concept Plans
  Phase II Technical Appendix
  Financial Analysis Technical Report

Gladiolus Widening:

Gladiolus Drive Displays
Gladiolus - Pine Ridge Rd.
to AW Bulb Rd.
Gladiolus - AW Bulb Rd.
to Bass Rd.
Gladiolus - Bass Rd.
to Winkler Rd.

Phase I

Phase II

Gladiolus Ph I Roadway Gladiolus Ph II Roadway
Gladiolus Ph I Signing Marking Gladiolus Ph II Signing Marking
Gladiolus Ph I Signals Gladiolus Ph II Signals
Gladiolus Ph I Lighting Gladiolus Ph II Lighting
Gladiolus Ph I Structure Gladiolus ROW
Ortiz Ave. from SR. 82 (MLK) to SR. 80 (Palm Beach Blvd.)
NOTES TO REVIEWER PH II
Roadway Plans - in Progress Final Plans
Structures Plans - 90% in Progress Submittal (Revised)
Landscape Plans - 90% in Progress Submittal (Revised)
  Fort Myers Sanitary Sewer and Water Main Plans
  Lee County Sanitary  Sewer and Water Main Plans
 
Three Oaks Parkway
Three Oaks Parkway - Airport Canal to Daniels Pkwy. 90% Submittal
Three Oaks Parkway Extension  Alico Rd. to Sta. 163+49.02
Three Oaks Parkway - Corkscrew Rd. to Alico Rd.
Three Oaks South 100% Submittal  Brooks to Imperial St.
 
Downloads:

TECO-PEOPLES GAS

SR 78